WE-OMC/168/DV: To approve the scope extension for RETL Deutsche WindGuard for Loads Testing (Closes 19-May)

starts on 01 May, 2017 ends on 19 May, 2017



Should the US vote to approve the scope extension for RETL Deutsche WindGuard Consulting GmbH for Loads Testing within the IECRE System?

You need to log-in if you want to continue with the voting process
Description

BACKGROUND:

At the 5th WE-OMC meeting in Juno Beach, Florida on 2016-10-24 & 25, Deutsche WindGuard Consulting GmbH was accepted as RETL for Power Performance.

In accordance with IECRE OD-500:2016, the Executive Secretary of the IECRE recommends approval, by the WE-OMC Member Bodies, of Deutsche WindGuard Consulting GmbH for Loads Testing.

See the test laboratory summary extension assessment report summary distributed separately as WE-OMC/169/EAR.

If approved by the WE-OMC, and as per the rules, the REMC will be requested to ratify the decision. It should be noted that, upon acceptance by the WE-OMC, the scope of Deutsche WindGuard Consulting GmbH will be extended to include Loads Testing.

ACTION:
WE-OMC Member Bodies to approve the extension of scope of RETL Deutsche WindGuard Consulting GmbH for Loads Testing as an RETL within the IECRE System.
WE-OMC Member Bodies are requested to vote on the approval no later than
2017-05-26.

NOTE: USNC/IECRE ballots to be submitted one week prior to the IEC deadline.

ARESCA © 2025 All rights reserved